An important target group for the general expansion of charging infrastructure are public institutions such as the road maintenance department in the province of Lower Austria.
For the municipal vehicles consisting of internal fleet, three Hyperchargers were installed in each of three central branches of the Road Maintenance Office of Lower Austria.
Charging infrastructure for road maintenance has been installed at the following locations:
A 150kW fast charger is located at all three sites. The chargers are linked to an integrated load management system. This ensures that electricity load peaks are balanced and only as much energy is used as is available at the time of charging.